High Precision Transformer Integrated Testing Equipment for 3 Phase Transformer
Contact Supplier
Product Highlights
- Multi-Function Integration: Combines transformer capacity and characteristic parameter testing into one instrument.
- Wide Capacity Range: Measures transformers from 30kVA up to 65000kVA accurately.
- Automatic Range Switching: Internally switches voltage (0-700V) and current (0-100A) ranges automatically.
- Three-Phase Vector Analysis: Automatically verifies wiring and displays three-phase voltage and current vector diagrams.
- Full Customization Support: Offers full customization, design-based customization, and flexible minor customization options.
- Fast Lead Time: Peak and off-peak season delivery within 15 working days.
- 100% Quality Inspection: All finished products undergo 100% functional inspection before shipment.
Product Attributes
- Customization
- Available
- Orgin
- Hubei China
- Input Power
- 220V±10% 50Hz/60Hz±10%
- Model NO.
- CYSC-211
- Capacity
- 30kVA~65000kVA
- Temperature
- -5℃~40℃
- Voltage
- 0~700V
- Relative Humidity
- <90%
- Current
- 0~100A
- External Power Supply
- 220V±10%, 45Hz~60Hz
- Transport Package
- Wooden Box with Foam Inside
- Specification
- Can be customzied
- Trademark
- United Electrical
- Origin
- Wuhanchina
- HS Code
- 9030820000
Product Images of High Precision Transformer Integrated Testing Equipment for 3 Phase Transformer
Find Similar Products
Product Description
CYSC-211 integrated transformer tester can accurately measure the capacity, type, no-load current, no-load loss, short-circuit (load) loss, impedance voltage, etc.it is a multi-function measuring instrument, which is equivalent to two kinds of test instruments: transformer capacity tester and transformer characteristic parameter tester.
Product features
1,Integrated Transformer tester can accurately measure the capacity of various distribution transformers without source measurement, convenient and accurate
2,It can measure the empty load current, no-load loss, short circuit voltage and short circuit (load) loss of transformer
3,Automatic range switching within the instrument,it allow for measuring voltage and wide range of current ,the wiring is simple.
4,When the load and load of the three-phase transformer are tested, the instrument can automatically determine whether the wiring is correct, and show the vector diagram of the three-phase voltage and current
5,The single machine can measure the on load test in full-current flow of distribution transformer under <1000KVA;Measuring the on load test of distribution transformer under< 3150KVA in the condition of 1/3 rated current.(In the condition of 1/3 rated current,the instrument can be converted to load loss parameters of the rated current)
6,All test results are automatically corrected.The instrument can be used for automatic such as waveform correction, temperature correction, non-rated voltage correction, non-rated current correction, etc,to make the test results more accurate.
Product parameters
| Environment Condition | Temperature: -5ºC~40ºC | Measurement Range | Capacity: 30kVA~65000kVA |
| Relative humidity: <90% | Voltage: 0~700V, automatically switch measurement range internally | ||
| Altitude: <2500m | Current: 0~100A, automatically switch measurement range internally | ||
| External disturbance: no special strong vibration, no special strong electromagnetic field | Frequency: 45Hz~65Hz | ||
| External power supply: 220V±10%, 45Hz~55Hz | |||
| Measurement accuracy | Voltage: 0~100V, ±0.2%FS; 100~700V, ±0.2% | ||
| Current: 0~10A, ±0.2%FS; 10~100A, ±0.2% Power: ±0.5%(CosØ>0.1), ±1.0%(0.02<CosØ<0.1) |
|||
Company Profile
Kiyu Power is a high-tech enterprise professionally engaged in R & D, manufacture and marketing of power testing products, instruments, power industry automation systems for 20 years.We export completed set to Korea, Singapore, Vietnam, India, Ecuador, Paraguay, Pakistan, Philippines, Russia, Italy, Austria, Portugal, Chile such as PD test system, impulse voltage generator, temperature rising test system, transformer comprehensive test system, cable fault detect system and varies of instruments for transformer, circuit breaker, switchgear, lightning arrestor, insulator, cable, battery,SF6 gas and so on.
Competitive Products
Certifications
Customer Visit
On-site Service
Package and Delivery
About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASI249120". Items marked "" are certified.
Company Profile
Kiyu Power Wuhan Co., Ltd is a high-tech enterprise professionally engaged in R & D, manufacture, and marketing of power testing products, instruments, power industry automation systems, which are supplied for national power companies, metallurgy petrochemical corporations, factories and public institution.
Established in 2002, located in Wuhan city, Hubei province. Owns 4000 square meters factory area and 120 staff members. We have developed total more than 160 kinds of electrical test products, which achieved qualifications and honors of "High-tech enterprise certification", "ISO9001 quality management system certification", "Electrical Measuring& Testing Association of Hubei Province".
23 years of experience and strong R& D support made us become a leader in the field of power on-site testing. The domestic market have been expanded to many provinces and cities nationwide, and our products have been recognized by diverse range of industrial sectors. The business is increasing every year.
Meanwhile, we have also been actively marketing in oversea market. Until now, our products have been exported to USA, Australia, Russia, India, Pakistan, Vietnam, Middle East, Korea, Singapore. The reliable performance and competitive price of our products have obtained us high praise from our overseas customers.
With the spirit of "Unity, diligent, responsibility, innovation", we will always develop better products and provide our customers with high quality products and satisfactory services, to achieve our brand concept: "Electrical Technology, Security Experts"
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- No. 8, Fuzhi Road, Hengdian Street, Huangpi District, Wuhan City, Hubei Province, Wuhan, Hubei, China
-
Plant Area
- 6000 square meters
-
Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays -
Nearest Port
- Shanghai Port
-
Minimum Order Quantity
- 1 Set
-
Supply Chain Partners
- 346
Our Production Capability & Technical Expertise
- Main Products
- Oil Transformer, Impulse Voltage Generator, Vlf Hipot Test Equipment, Loop Resistance Tester, Relay Protection Tester, Pd Test System, Cable Fault Tester, Tuning Resonance Test Device, DC Hv Generator, Lightning Arrester
-
Production Lines
- 4
-
Production Machines
- Injection Machine, Injection Molding Machine, Winding Machine
-
QA/QC inspectors
- 7 people
-
Inspection Type for Finished Products
- 100% inspection(Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Full Customization, Customization from Designs, Minor Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 4 people
-
Traceability of Raw Materials
- Yes
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Export Year
- 4 Years
-
Main Markets
- North America, Europe, Domestic
-
Repeat Buyers Choice
- 30%~50%
-
Number of Foreign Trading Staff
- 1
-
Overseas Agent/Branch
- No
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Cooperated with Fortune 500
- Yes
FAQ
- What is the measurement capacity range?
- The instrument can measure transformer capacities ranging from 30kVA to 65000kVA.
- Does the device support automatic range switching?
- Yes, it automatically switches measurement ranges for voltage (0-700V) and current (0-100V) internally.
- What is the minimum order quantity?
- The minimum order quantity is 1 set.
- Is customization available for this equipment?
- Yes, we offer full customization, customization from designs, minor customization, and flexible customization options.
- What is the delivery time for orders?
- Both peak and off-peak season lead times are within 15 working days.
- How is quality control handled for finished products?
- All finished products undergo 100% functional inspection before shipment.
- What payment terms are accepted?
- We accept LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
Send your message to this supplier
People who viewed this also viewed
-
US$500.00-2,800.00 / Piece
-
US$500.00-2,800.00 / Piece
-
US$800.00-2,500.00 / Piece
-
US$1,000.00-2,000.00 / Piece
-
US$500.00-2,800.00 / Piece
-
US$500.00-3,100.00 / Piece
-
US$500.00-3,100.00 / Piece
-
US$2,000.00-3,800.00 / Piece
-
US$500.00-2,500.00 / Piece
-
US$1,000.00-3,500.00 / Piece
Product Groups
- Safety Tools(Gloves, boots, rubber blanket) Test Equipment
- High Voltage Test Equipment
- Partial Discharge Test System
- Lightning Impulse Voltage Generator
- Primary Current Injection Set
- Transformer Oil Tester
- Transformer Test Equipment
- Circuit Breaker Test Equipment
- CT/PT Analyzer
- Relay Test Kit
- SF6 Gas Analyzer
- Surge Arrester
Find Similar Products By Category
- Supplier Homepage
- Products
- Transformer Test Equipment
- Transformer Load / No-load Loss Tester
- High Precision Transformer Integrated Testing Equipment for 3 Phase Transformer
Related Categories
Hot Searches
- Electronic Load Factories
- Safety Test
- Load Machine
- Meter Test Equipment Factories
- Transformer Tester Factories
- Instrument Transformer Test Equipment
- Transformer Resistance Test
- Transformer Oil Test Set
- Current Transformer Test Instrument
- Transformer Test Machine Bulkbuy